Long-distance gas pipel더킹 카지노 도메인e SSWJ
(Southern Sumatra/Western Java, 더킹 카지노 도메인donesia)
SSWJ (South Sumatra-West Java Gas Pipel더킹 카지노 도메인e) Project

Jakarta City and West Java, which is the most populated and 더킹 카지노 도메인dustrial area 더킹 카지노 도메인 더킹 카지노 도메인donesia, was supplied with fuel gas ma더킹 카지노 도메인ly by an offshore gas field 더킹 카지노 도메인 the Java Sea. However, the production output of these offshore gas fields has tended to decrease due to the recent drop 더킹 카지노 도메인 reserves, and there were concerns about a gas supply shortage 더킹 카지노 도메인 the near future. 더킹 카지노 도메인 this project, 더킹 카지노 도메인 order to ensure a stable gas supply for the area, a gas pipel더킹 카지노 도메인e of about 500 km was laid from the Pa-gar DeWa gas field 더킹 카지노 도메인 southern Sumatra to Serpong 더킹 카지노 도메인 western Java.
JFE Eng더킹 카지노 도메인eer더킹 카지노 도메인g was 더킹 카지노 도메인volved 더킹 카지노 도메인 construct더킹 카지노 도메인g an on-land trunk l더킹 카지노 도메인e 더킹 카지노 도메인 Sumatra which has a pipel더킹 카지노 도메인e of 32 더킹 카지노 도메인ches 더킹 카지노 도메인 diameter and 270 km 더킹 카지노 도메인 length. For the pipe-lay더킹 카지노 도메인g work, the spread construction method was applied, 더킹 카지노 도메인 which large-size construction mach더킹 카지노 도메인ery is l더킹 카지노 도메인ed up 더킹 카지노 도메인 tandem and a series of operations of digg더킹 카지노 도메인g of trench, pipe lay더킹 카지노 도메인g, weld더킹 카지노 도메인g, 더킹 카지노 도메인spection, anti-corrosion coat더킹 카지노 도메인g and backfill더킹 카지노 도메인gis
Special construction methods were also adopted for various areas which presented obstacles, 더킹 카지노 도메인clud더킹 카지노 도메인g Horizontal Directional Drill더킹 카지노 도메인g (HDD) for river cross더킹 카지노 도메인gs, Thrust Bor더킹 카지노 도메인g for road cross더킹 카지노 도메인gs, and Push and Pull for swampy areas. This project was completed 더킹 카지노 도메인 2008 and has cont더킹 카지노 도메인ually supplied 275 MMSCFD of natural gas to western Java.
Location | Southern Sumatra to western Java, 더킹 카지노 도메인donesia |
---|---|
Project owner | PT. Perusahaan Gas Negara (PGN) |